Life’s a Picnic

So, currently I am in my second and final management rotation. The BIG project that normally gets completed during your second management rotation is your theme day. This is when you combine all your skills you have developed and you plan, execute and evaluate a themed meal. I planned my theme day in about a weeks time. It was a lot to get done, but I would rather than then wait to the last minute. April 24th was the day!

My theme day was Springtime Picnic themed, so I decided to have BBQ Chicken, Garlic Bread, Pasta Salad and Apple Cobbler as my menu. Here is all I had to do:

  • Develop and standardize recipes (I had to make about 120 servings).
  • Determine ingredients I needed to purchase.
  • Ordered my food items from my food distributor.
  • Develop a production schedule (What needs to happen when).
  • Determine cost per meal and selling price for the meal.
  • Receive the food from the delivery truck.
  • Prepare the food.
  • Decorate the cafeteria.
  • Develop an meal evaluation tool.
  • Advertise the meal.
  • Serve the meal.
  • Make sure everything runs smoothly on the day of and make sure we don’t run out of food.

Overall it went very very well. It was a long day to say the least (I got there at 6 am!) I am so lucky that I have a great and helpful staff. The cafeteria cook helped me with my chicken.

All my chicken!

All my chicken!

The day before my theme day, I made my pasta salad, so all I needed to do with that was scoop it into little cups for service. The cobblers were really easy to put together, as was the garlic bread. My goal for this theme day was to put together a great meal, but also make it relatively easy and simple. I didn’t want anything super high stress or technical. Ain’t nobody got time for that.

The day went smoothly except for one little hiccup…

My 2nd Degree Burn

My 2nd Degree Burn

I almost dropped a large sheet pan with two cobbler on it. Instead of letting the pan drop, I jerked the pan towards me and it slid onto the underside of my wrist. It hurt, but at least my cobblers weren’t ruined. The executive chef at the hospital assisted me in pouring some salt on my wrist. This helps draw out the moisture to prevent a blister from forming. I slide a glove over it to protect myself, but I ended up working the rest of the morning with only one arm. You do what you got to do though!

The cafeteria was very very busy during lunchtime, which is unusual for Glenwood. There is usually a steady stream of people, but there was an extra amount of people that day. It was awesome!

This slideshow requires JavaScript.

After the day was over, lots of the cafeteria workers told me my theme day was one of the most well planned and smoothest theme days that had seen. I thought that was a huge compliment. They also loved my decorations!!

Overall, I thought it was a successful day, and now I get to spend my last two weeks writing up my evaluations about my theme day and doing whatever my preceptor needs. It’s all downhill from here!

XOXO, Danae

20 Days Until Graduation!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s